29 Jun April 2026: Investment $6310
Revamped our water “system” at FCC in Tanzania replacing the existing water tank and stand. This project was done and completed in advance of the construction of the dining building, but is set up to accommodate it.
- Purchased a new larger water tank that holds 5000 liters, paint, pipes, cement and other building materials.
- Built a taller, sturdier water stand.
- Hired a skilled plumber and engineer to run pipes underground to the village’s central water source.
- Paid for health insurance for Lotha that was pending because of an issue with his ID card
- Deposited $1000 into our Tanzania bank as a “reserve” amount in case of emergencies.
Sorry, the comment form is closed at this time.